Kalanga Gad Hydro Electric Project (15.33 MW)

Owner : Kalanga Hydro Ltd.

Installed Capacity : 15.33 MW

Total value : USD $16,399,757.98 (Inc. VAT) Civil Works

Major Civil Components of the Project:

          Weir : 64m x 40m x 8.5m

          Power culvert : 611m length

          Headrace Tunnel:

          Length : 3,468m

          Inverted D, Diameter : 3.86m

          Surge Shaft:

          Height : 49m (Depth)

          Excavated Diameter : 7m

          Finish Diameter : 6m

          Penstock:

          Length : 300m

          Diameter : 2.5m

          Powerhouse Size : 40m x 13m x 24m

 

Hydro-mechanical Details:

Total Value : USD $ 812,197.65 (Inc. VAT)

No. of Gates : 22

Total Weight of Penstock : 391 ton

 

Transmission Line Details:

Total Value: : USD $ 135,311.58 (Ex. VAT)

          (33kV Sub-Transmission Line)

Length of TL : 8,000m