Skip to main content

Sunam Infrastructure Nirman Pvt. Ltd.

Super Aankhu Hydropower Project (25.4 MW)

Owner : Gorakshya Hydro Pvt. Ltd.

Installed Capacity : 25.4 MW

 Total value : USD $ 13,915,351.46 (Inc. VAT) Civil Works

Major Civil Components of the Project: 

          No. of Hedworks : 1

          Headrace Tunnel :  

          Length : 3592.56m

          Inverted D Shape : 3.9m Width and 4.1m Height

          Surge Shaft : 36m (Depth), 8.7 m diameter

          Penstock:

          Length : 380m

          Diameter : 2.6m

          Vertical Shaft : 160m Deep, 4m diameter

          Horizontal Shaft : 120 m Length (3.4m Width x 3.5m Height)

          Powerhouse Size : 34.7m x 15.5m x 23m