Upper Kalanga Gad Hydro Electric Project (38.4 MW)

Owner : Sanigad Hydro Pvt. Ltd.

Installed Capacity : 38.46 MW

Total value : USD $27,091,918.13 (Inc. VAT) Civil Works

Major Civil Components of the Project:

           Weir : 57m x 30m x 8.3m

           Headrace Tunnel:

           Length : 7,811m

           Inverted D, Diameter : 2.96m

           Surge Shaft:

           Height : 47m (Depth)

           Excavated Diameter : 6m

           Finish Diameter : 5m

           Penstock:

           Length : 1,250m

           Diameter : 2.5m

           Powerhouse Size : 47m x 13.5m x 15m

Hydro-mechanical Details:

Total Value : USD $ 1,351,724.73 (Inc. VAT)

No. of Gates : 31

Total Weight of Penstock : 1,378 ton

Transmission Line Details:

Total Value: : USD $ 397,915.76 (Inc. VAT) (33kV Sub-Transmission Line)

Length of TL : 23,500m