Skip to main content

Sunam Infrastructure Nirman Pvt. Ltd.

Nupche Likhu Hydropower Project (57.5 MW)

Owner : Vision Energy and Power Ltd.

Installed Capacity : 57.5 MW

Total value : USD $ 25,866,900.87 (Inc. VAT) Civil Works

 

Major Civil Components of the Project:

          No. of Headworks : 2

          Headrace Tunnel:

          Length : 7250m

          Inverted D, Diameter : 3.2m, Height: 3.5-3.8m

          Surge Shaft : 48m (Depth)

          Penstock:

          Length : 1400m

          Diameter : 1.2-0.9m

          Vertical Shaft : 300m Deep, 2.9m Diameter

          Powerhouse Size : 51m x 13m x 27m