Sunam Infrastructure Nirman Pvt. Ltd.
Owner : Gorakshya Hydro Pvt. Ltd.
Installed Capacity : 25.4 MW
Total value : USD $ 13,915,351.46 (Inc. VAT) Civil Works
Major Civil Components of the Project:
No. of Hedworks : 1
Headrace Tunnel :
Length : 3592.56m
Inverted D Shape : 3.9m Width and 4.1m Height
Surge Shaft : 36m (Depth), 8.7 m diameter
Penstock:
Length : 380m
Diameter : 2.6m
Vertical Shaft : 160m Deep, 4m diameter
Horizontal Shaft : 120 m Length (3.4m Width x 3.5m Height)
Powerhouse Size : 34.7m x 15.5m x 23m